Full-Container Preparation Only · Loading, Securing, VGM, Seal and Acceptance Require Responsible Parties
FCLShippingEXCLUSIVE FLOOR / 21
CURRENT HOLD POINTL02Loading
BM
L02 / FCLSHIPPING

Loading preparation

Observe and record. A qualified responsible party owns the actual method, limits and approval.

Illustrative preparation setting only
L01

Receipt condition

Observe floor, walls, doors, residue, water and visible damage; escalate concerns.

L02

Sequence + distribution

Describe package sequence and intended positions; do not calculate a safe distribution.

L03

Protection + securing

Carry blocking, bracing, lashing, void and edge questions to a qualified responsible party.

CTU CODE / RESPONSIBLE REVIEW

Questions before the doors close

  1. Is the actual unit suitable and free from unresolved condition concerns?
  2. Who owns distribution and any concentrated-load limits?
  3. Who selected and reviewed blocking, bracing or lashings?
  4. Are dangerous or regulated cargo requirements resolved?
  5. Is the required VGM information available through the responsible process?
B05 / NEXT ACTION

Carry the answer into one private review brief.

The readiness floor keeps declared facts, named owners, unknowns and stop states visible together.

Build the brief →